MANUFACTURING EXECUTION MODULE

Production Management System
Shop-Floor OEE & Real-Time Capacity

Orchestrate plant lines, machine capacity, and paperless operator workflows. We deploy IoT sensor telemetry, automated master scheduling, and in-line digital quality gates to maximize plant OEE.

Duration
8 – 12 Weeks
Format
Shopfloor Diagnostics & Custom ERP
Core Output
Live Scheduler, IoT OEE & Quality QA
BOM LINE 1 QC PASS 94.2% PLANT OEE FG
Live IoT Sensor Stream 100% In-Line QA
PRODUCTION CAPABILITIES

Core Production Management Deliverables

Everything needed to orchestrate factory lines, eliminate downtime, and run precision shop-floor operations.

Plant-Ready

Master Capacity Scheduler

Multi-level Bill of Materials (BOM) explosion, machine availability calendars, and automated job dispatching.

  • Multi-Level BOM Explosion
  • Dynamic Line Rebalancing

IoT OEE & Downtime Analytics

Real-time machine sensor feeds (PLC/SCADA/MQTT) tracking availability, cycle times, and micro-stoppages.

  • Live OEE Telemetry Gauges
  • Automated Stoppage Categorization

Digital Operator Workflows

Tablet-based digital work instructions, in-line QA inspection gates, defect logging, and operator scrap recording.

  • Paperless Shop-Floor SOPs
  • In-Line Quality Sign-Offs

Predictive Maintenance & Spares

Sensor anomaly detection for motor vibration and temperature, automated work order generation, and spare parts ledger.

  • AI Anomaly Detection
  • Critical Spares Reorder Gates
IMPLEMENTATION TIMELINE

The 8–12 Week Production System Rollout

A proven agile roadmap taking plant operations from manual spreadsheets to real-time digital execution.

WEEKS 1 – 3 01

Plant Diagnostics & IoT Setup

Auditing shopfloor machine lines, mapping multi-level BOM structures, and connecting PLC / IoT telemetry gateways.

  • Machine PLC / gateway connectivity
  • Routing & BOM architecture definition
WEEKS 4 – 8 02

Scheduler Engine & Tablet UIs

Deploying the dynamic scheduler, building operator tablet apps, and integrating with ERP inventory ledgers.

  • Scheduler algorithm optimization
  • Operator tablet app deployment
WEEKS 9 – 12 03

Pilot Cutover & Plant Rollout

Executing line balancing trials, training plant supervisors & operators, and cutting over to full live production.

  • Pilot line validation & signoff
  • Plant supervisor & operator training
DEDICATED PLANT SQUAD

Senior Manufacturing & IoT Engineers

Engineers with deep domain experience in factory execution systems, PLC telemetry, and production scheduling.

Principal Manufacturing Architect

Industrial IoT & ERP Lead

Architects shopfloor integration protocols, BOM master data standards, and end-to-end ERP data synchronizations.

Lead Automation & OEE Engineer

Shopfloor Telemetry & Scheduler

Builds dynamic line scheduling algorithms, configures PLC/MQTT sensor gateways, and manages real-time OEE dashboards.

Industrial QA & Compliance Specialist

Digital QA & Traceability

Designs digital inspection workflows, non-conformance logging, operator tablet UI interfaces, and batch traceability.

READY TO MODERNIZE PRODUCTION

Maximize Plant Output & Eliminate Production Blindspots

Schedule a plant diagnostic with our manufacturing engineers. We'll evaluate your line bottlenecks, review machine telemetry, and structure a rollout plan.

8–12
Weeks Rollout
↑ 25%
Plant OEE Uplift
100%
Source Code & Plant Data Ownership